Eastridge Park Redevelopment

Share Eastridge Park Redevelopment on Facebook Share Eastridge Park Redevelopment on Twitter Share Eastridge Park Redevelopment on Linkedin Email Eastridge Park Redevelopment link

The 9.8-acre community park was originally a part of King County parks. In 1996 Eastridge was transferred to Kent Parks as part of the Meridian annexation. The original equipment was last up updated in 1997. Kent Parks Planning Department is looking to replace old, outdated playground equipment and improve sight amenities in spring of 2026.

The 9.8-acre community park was originally a part of King County parks. In 1996 Eastridge was transferred to Kent Parks as part of the Meridian annexation. The original equipment was last up updated in 1997. Kent Parks Planning Department is looking to replace old, outdated playground equipment and improve sight amenities in spring of 2026.

  • CLOSED: This survey has concluded.
    Share East Ridge Redevelopment Survey on Facebook Share East Ridge Redevelopment Survey on Twitter Share East Ridge Redevelopment Survey on Linkedin Email East Ridge Redevelopment Survey link
  • We would like to hear which design you would prefer at East Ridge Park!

    Check the design themes and watch the videos - the tell us which design you prefer!

    Take Survey
    Share Playground Design Survey on Facebook Share Playground Design Survey on Twitter Share Playground Design Survey on Linkedin Email Playground Design Survey link
Page last updated: 28 Feb 2026, 09:52 PM